Other

In Krasnoyarsk, they began to lay a metro tunnel from high -altitude to Kopylov (video)


August 5 13:39

In Krasnoyarsk, the construction of the left distillation tunnel of the metro from the future station “Vysotnaya” to Kopylov Street began. This was announced in his telegram channel by Mikhail Kotyukov.

The tunnel -extension complex “Eugene” will pass the path of 2.5 km. It will work at a depth of 10 to 49 meters. Thus, the foundation pit of the future Kopylova Street will be the deepest. For waterproofing underground, specialists will have to lay 1887 rings from reinforced concrete blocks.

In Krasnoyarsk, they began to lay a metro tunnel from high -altitude to Kopylov


Source: T.ME/MKOTYUKOV

Recall that the right tunnel on this route was built in the early 2000s. The examination showed that it is suitable for further operation, but the builders will check the joints and connections of previously mounted tubing, and also finish 300 meters to the station complex.

Recall that the total length of the Metrotramva line in Krasnoyarsk at the first stage is 11 km, there will be six stopping points on it: “High -altitude”, “Kopylova Street”, “Stzannaya”, “Revolution Square”, “Carl of Karl Marx Street” and “Skomerov Street”. General Construction Contractor-Mosproekt-3 Group of Companies, subcontractor-a group of companies Bamtonnelstroy-Most.