Other

In Krasnoyarsk Michurinsky, the school under construction is 58% ready


March 25 13:50

In Krasnoyarsk, in the Michurinsky microdistrict, the construction of a new school is 58% complete.

According to the telegram channel of the city hall “GradVestnik”, 4 blocks of the building are already ready, the thermal circuit is closed for all. Inside buildings work is currently underway on finishing the premises and installing internal utility networks. WITHBuilders are installing ventilation systems and installing electrical networks. And tiredpour in systemss fire safety. In the offices, specialists are plastering the walls and laying tiles in the bathrooms.

“Outside, the facades of the school are already shining brightly. Builders will begin landscaping as soon as the weather permits, while the ground is still frozen: vertical filling is done only in the yard,” to be specified in the message.

Let us add that the school is designed for 1280 places and is being built on the street. Volzhskaya. RThe work is carried out by JSC Firm Kultbystroy, construction control is carried out MKU “Capital Construction Department”.

According to the contract, the school should be built in early 2027. After commissioning, the educational institution will be transferred to the education department.

Newslab now in MAX. News is also published in OK | VK | Zen | Telegram



















Related links:





Ashley Davis

I’m Ashley Davis as an editor, I’m committed to upholding the highest standards of integrity and accuracy in every piece we publish. My work is driven by curiosity, a passion for truth, and a belief that journalism plays a crucial role in shaping public discourse. I strive to tell stories that not only inform but also inspire action and conversation.

Related Articles

Leave a Reply

Your email address will not be published. Required fields are marked *

Back to top button