Other

Max now has a channel for informing about hot water outages in Krasnoyarsk


4 June 16:41

Hydraulic testing is underway in Krasnoyarsk – this is a mandatory important stage in preparing heating systems for winter. They allow you to identify bottlenecks in pipelines and quickly eliminate them.

Related materials

Thanks to large-scale renovation of pipelines and timely inspections in the past heating season, damage to Krasnoyarsk heating networks was reduced by a third.

From May 27 to June 5, hydraulic tests with hot water turned off are taking place in the Oktyabrsky, Zheleznodorozhny, Tsentralny districts and most of the Sverdlovsk region.

From June 15, testing of heating systems will begin in other areas of the regional center.

To inform citizens as quickly as possible, Siberian Generating Company launched a channel in the Max messenger. In real time, they report the dates of hot water outages, as well as any changes in the schedule.



















Related links:

  • Summer large-scale cold water outages are canceled in most parts of Krasnoyarsk

  • Deputy: in Krasnoyarsk it is possible to halve the duration of hot water shutdowns




Ashley Davis

I’m Ashley Davis as an editor, I’m committed to upholding the highest standards of integrity and accuracy in every piece we publish. My work is driven by curiosity, a passion for truth, and a belief that journalism plays a crucial role in shaping public discourse. I strive to tell stories that not only inform but also inspire action and conversation.

Related Articles

Leave a Reply

Your email address will not be published. Required fields are marked *

Back to top button