

During the construction of the stadium, the No-Blockwork strategy was used, when each element is so carefully planned that the installation of steel structures occurs without the use of traditional brickwork. This approach needed high -quality materials and the effective implementation of the project – and here the hot -rolled sheet of the Spartan UK group “Metinvest” played one of the key roles.
Until recently, Everton spent his home matches at the 39,000th Gudison Park stadium, which has been 130 years old.
“In 2017, Everton announced plans to build a new stadium in the Bramli-Mur docks area. Two years later, a construction project was presented, and in February 2025 the new football pearl of the city of Liverpool for 53 thousand spectator places first took fans in the stands,” the Metinvest said.
Of the steel of Metinvest, the Olympic NSC was also built in Kyiv, the company reminded.




