Other

Krasnoyarsk Railway will update more than 30 railways with intensive movement before the onset of cold weather

July 2 16:03

The Krasnov is repairing railway crossings at the checks and stations in the Krasnoyarsk Territory, Khakassia and the Kemerovo Region: before the end of the warm season, it is planned to update 34 such facilities.

A program that ensures high reliability of infrastructure at the intersection of roads and railways, It is implemented in order to increase traffic safety and prevent traffic accidents.

Overhaul is on four crossings in the Bogotolsky, Nizhnegashsky and Rybinsky districts of the Krasnoyarsk Territory, they are located at the intersection of the railway with the Federal Road Trassx R-255 Siberia.

These are moving in the villages of Vagino (Bogotilsky district of the Krasnoyarsk Territory), Sulemka (Nizhneingashsky district) and New Solyanka (Rybinsky district). A new rubber cord flooring will be laid on them, preventing sliding and the formation of ice in the winter and preventing the towing and skidding of machines. Asphalting of the road sections on the approaches will also pass.

291 moves are operated on Krasn. The measures for their repair and modernization are held annually. The list of objects and the volume of repair are determined based on planned schedules, as well as by the results of infrastructure examinations.

Similarly, 5 crossings are modernized on the Abalakovo -Lesosibirsk stage and within the city of Lesosibirsk (Krasnoyarsk Territory). One of the objects is located on a regional highway “Yenisei Trakt” with a traffic of more than 7 thousand cars per day.

Also, moves in Askiz (Republic of Khakassia), Krasnoyarsk (Vavilov St.), Red Sopke (Nazarovsky district of the Krasnoyarsk Territory) and on the Solimonovo – Filimonovo (Rybinsky district) will also be thoroughly repaired.

In addition, during the summer, railway workers will update guide columns, warning signs and asphalt coverage at the 21st such object.