In 2025, an electrochemical plant will allocate 100 million rubles for the development of Zelenogorsk


April 22 17:43
The Board of Directors of JSC “PO Electrochemical Plant” (JSC “On the ECH”, the enterprise of the fuel division of Rosatom in ZATO Zelenogorsk Krasnoyarsk Territory) supported the implementation of several infrastructure projects as part of the “People and City” program.
In 2025, the ECP will allocate 100 million rubles for the implementation of several infrastructure projects in Zelenogorsk at once. At the initiative of the President of Twel JSC (management company of the fuel division), Natalia Nikipelova support will receive initiatives determined by the survey of residents of Zelenogorsk.
Among the projects scheduled for 2025:
- Repair of the porch and the small hall of the Zelenogorsky city palace of culture;
- Repair of the road section from the intersection st. Embankment – the first industrial to the ECP;
- Replacing more than 700 outdated sodium lamps on city roads for energy -efficient LEDs.
Support is within the framework of the Rosatom program to form a sustainable social environment “People and Cities”, in which Zelenogorsk joined in 2023. During this period, the electrochemical plant has already supported a number of large -scale projects totaling 200 million rubles. Lighting was organized on these funds on the streets of the working and industrial, the stele “Zelenogorsk” was repaired, pedestrian paths were equipped, a children's town was installed on the embankment, a volcan for bears in the city zoo was built, and a new steam was acquired. Note, eThat is only part of the great work that ECP is carried out for the development of atomic Zelenogorsk.
Links on the topic:
- “A joint project will continue”: the Center for Industrial Medicine has opened in Zelenogorsk




