Featured

The M4 metro line is being extended with 14 new stations. Baluță: “Bucharest will be united on the north-south axis”

The mayor of Sector 4 and also a candidate for the position of general mayor of the Capital announced that next week the design and execution contract for the extension of the M4 metro line will be signed.

New steps for the extension of the M4 metro line PHOTO: Facebook/Daniel Băluță

New steps for the extension of the M4 metro line PHOTO: Facebook/Daniel Băluță

The project envisages the construction of 14 new stations between Gara de Nord and Gara Progresul.

“Next week, we are signing the design and execution contract for the extension of the M4 metro line, with 14 new stations between the North Station and the Progresul Station. In a first phase, we will start the design for lot 1, the one between the North Station and the Heroes of the Revolution.

Later, we will also take care of lot 2, between the Heroes of the Revolution and the Progresul Station, so that Bucharest will be united on the north-south axis, having a fast and ecological means of transport at its disposal”, announces Daniel Băluță, the mayor of sector 4, in a post on Facebook.

The actual works, amounting to around €2.5 billion, non-reimbursable European money accessed through “Transport Program” of the European Union 2021-2027, are scheduled to start during 2026 and will last a maximum of five years.



Ashley Davis

I’m Ashley Davis as an editor, I’m committed to upholding the highest standards of integrity and accuracy in every piece we publish. My work is driven by curiosity, a passion for truth, and a belief that journalism plays a crucial role in shaping public discourse. I strive to tell stories that not only inform but also inspire action and conversation.

Related Articles

Leave a Reply

Your email address will not be published. Required fields are marked *

Back to top button