Instead of producing boilers, components for Jelcz. Prime Minister: 500 jobs will be created

2025-10-14 12:57
publication
2025-10-14 12:57
More than 500 people will find work in the Jelcz branch, which will be built on the site of the former Rafako boiler factory, Prime Minister Donald Tusk announced on Tuesday in Racibórz.


After visiting the RFK company in Racibórz, the Prime Minister said at a press conference that missiles and radars will be mounted on the chassis that will be manufactured in Racibórz and which are necessary from the point of view of the Polish army.
– This place, in a sense, saves Jelcz, which should produce more than it is currently able to – emphasized the head of government.
Raciborska Fabryka Komponentów (RFK) is a company established by the Industrial Development Agency (ARP), Towarzystwo Finansowe “Silesia” and Polimex Mostostal in order to take over the assets of the bankrupt Rafako company. Rafako provided specialized solutions for the energy, heating and oil and gas industries in Poland and abroad. (PAP)
pif/ mrr/




