Zelenogorsk ECHZ allocated 35 million rubles for the repair of the city clinic


May 30 16:33
The city clinic of the Zelenogorsk Clinical Hospital No. 42 continues to be transformed thanks to the support of JSC E -Chemical Plant JSC (JSC “according to the ECHZ”, an enterprise of the fuel division “Rosatom” in Zhelenogorsk Krasnoyarsk Territory).
As part of the joint project of the FMBA of Russia and the State Corporation Rosatom, “Improving the quality of medical care”, the electrochemical plant allocated 35 million rubles for repair work. Now the repairs are held in the left block of the second floor. Next in line according to the schedule of work is the right block.
As the head of the clinic Anastasia Filatova notes, all interior rooms (rooms, procedural) are subject to repair – not only the walls will be painted there, new suspension ceilings will be mounted, linoleum, tiles, doors will replace, but also replaced engineering networks – electric, low -current lighting, water supply and sanitation. They will replace morally and physically outdated floor power distribution shields.
Repair is carried out in one design project, which on the first and fourth floors repaired last year. Including it is planned to purchase furniture in the same style.
The contractor is already familiar to Zelenogorsk doctors for the repair of 2024, the Zheleznogorsk company LLC PSK Pentar. Recall, as part of the joint project of the FMBA of Russia and the State Corporation Rosatom, the Center for Industrial Medicine with the digital routing system has already been opened in the city clinic, the medical examination process, patient flow, have been optimized, and more comfortable conditions have been created for low -mobility.
Under the contract, work should be completed by December 1. Repair will be carried out in stages so as not to stop the therapeutic process. The leadership has already prepared a plan for the gradual movement of specialists. You can find out about all changes in the registry.
From the EHZ, repairs are supervised by authorized representatives of the enterprise. The third floor of the clinic will not be left without attention. Also, within the framework of the Comfortable Clinic project, the improvement of the territory beyond the city clinic with the organization of additional parking spaces is planned.
This initiative project has become one of the winners of the regional competitive selection as part of the program for supporting local initiatives. One of the conditions is co -financing by residents of the city. Fixed assets will be allocated from the regional budget, 12 percent – from the local budget. Thanks to the efforts of the doctors and responsiveness of the townspeople, 95 thousand rubles were raised – 3 % of 3 million 175 thousand rubles (project cost). At the next stage, the choice of a contracting organization will take place.
Links on the topic:
- The electrochemical plant helps organizations of Zelenogorsk increase the efficiency of work




