
The slabs and the frame of the hinged ceiling collapsed in a brand new school No. 5 on a high -voltage street in Ramensky near Moscow. The temple of science has not worked for the two months of the school year.
According to the parents, the school constantly disconnect electricity and video surveillance does not work. The building was only put into operation – on September 2, the first line took place.
❗️Subscribe to Mash