Rosseti Siberia restored the work of all energy facilities in the main network after a thunderstorm in the Krasnoyarsk Territory

June 24 11:41
Rosseti Siberia experts eliminated all technological violations on power facilities in the main network of 6-110 kV (provides mainly power supply to settlements) after the thunderstorm front, held on the night of June 22 in the Krasnoyarsk Territory.
The recovery work involved 55 Krasnoyarskenergo brigades: 190 power engineers and 62 units of equipment. As well as 7 reserve sources of power supply.
Currently, experts are performing individual consumer applications in the network of 0.4 square meters. These are distribution networks that provide power supply to directly residential buildings.

Recall that the main thunderstorm with a strong wind fell into the eastern and southeastern territories of the region. The main forces of the power engineers were concentrated in Irbey, Sayan, Nizhnegashsky, Kansky, Aban and other areas of the region.
The branch of Krasnoyarskenergo worked in a special mode, the work to eliminate the consequences of the Thunderstorm Front was under the control of the Rosseti Siberia operational headquarters. Power engineers are in constant interaction with the regional department of the Ministry of Emergencies of Russia, ODDS and executive authorities.
If the power supply in the house does not appear – call the free round -the -clock phone of the “bright line”: 8-800-220-0-220 (short number – 220) or write an exact address in the social network of the energy company.
Links on the topic:
- A large hail suddenly fell on Krasnoyarsk (video)




