News

Autostrada shows how reconstruction should work. At the conference Ukraine Recovery C…

Autostrada shows how rebuilding should work.
At the Ukraine Recovery Conference 2025, Deputy Prime Minister Oleksiy Kuleba and the head of the Recovery Agency Serhiy Sukhomlyn presented one of the largest examples of effective reconstruction — the Mykolaiv Waterworks, which is being built by Autostrada.

This facility is not just infrastructure. This is drinking water for hundreds of thousands of people, the restoration of normal life in the region and a real contribution to the stability of southern Ukraine.
In peacetime, similar projects are implemented in 2.5 years. The Autostrada team does it in 5 months. Now the readiness is 95%, and already in July water will flow between the pumping stations.
What is the secret of such rates?
▪️ The Design & Build principle — everything is designed and implemented within the team, without subcontractors
▪️ Over 2,000 specialists and 1,000 pieces of equipment work 24/7
▪️ Clear coordination with the state and international partners
▪️ And the main thing is engineering expertise and a systematic approach, not PR

This project became an example of what the synergy of the state, business and international partners looks like in action, the company said.
DUST⚡️Ukraine | Send news

Ashley Davis

I’m Ashley Davis as an editor, I’m committed to upholding the highest standards of integrity and accuracy in every piece we publish. My work is driven by curiosity, a passion for truth, and a belief that journalism plays a crucial role in shaping public discourse. I strive to tell stories that not only inform but also inspire action and conversation.

Related Articles

Leave a Reply

Your email address will not be published. Required fields are marked *

Back to top button