Other

Movement on the bridge at a camp site in Krasnoyarsk is planned to be launched on September 4


September 4 14:50

In Krasnoyarsk, a bridge is being repaired on a turbase street, which was destroyed during a rain.

According to the administration of the Sverdlovsk district, on the eve of the workers dismantled the boots of the bridge and prepared the basis for laying a new culverts. Today they will deal with installation. After that, the basis for laying road plates will be dumped.

Recall, on September 1, rain water damaged the bridge over the laletin stream on the camp of campaign, cutting off 30 houses of the private sector from the rest of the city.