Agigea lock line – Constanta Port Ferry -Boat was reopened for freight traffic after derailment of a freight train

The circulation of freight trains on the distance of Agigea Nord – Agigea Ecluza – Constanța Port Ferry -Boat was resumed on Tuesday, August 5, 4 days after it was closed following the derailment of one wagon and the overthrow of another.

The railway traffic on the distance of Agigea lock – Constanța Port was reopened
The railway transport of passengers was resumed, on the Constanța – Mangalia relationship, after the intervention teams of SRCF Constanța acted operatively and withdrew the non -involved wagons at the Agigea Nord station, so that the passenger trains were re -enrolled in circulation, in safe conditions, on the North I.
The wagons belong to the transrovial group (TFG) private operator.
“For the reopening of the line and the resumption, in the first stage, of the freight traffic with diesel traction, about 100 employees of SRCF Constanța, specialized personnel from the district of railway interventions, electrification sections, SCB and lines, mobilized in the area of derailment, they have permanently operated, in all this period, in all this period, with all this period, with all this period, with all this period, with all this period, with all this period, in all this period. lifting, resting on the rail and withdrawal of the rolling goods, as well as for the restoration of the railway over a distance of about 300 meters ”according to a press release.
The interventions are constantly conducting, and the railway staff of SRCF Constanța also makes sustained efforts to complete all the works on the railway affected by the derailment, so that the freight rail transport will resume, in a relatively short time, under normal traffic and safe conditions.
The Romanian Railway Investigation Agency (AGIFER), through the specialized commission for research, will determine the cases that led to the production of this derailment.




